The requirement was to fit-out & design Mine Warehouse , Workshops , Stores & Wash Down Facility.
Solution:
- The project was time critical. The Mine Warehouse included Pallet racking & Longspan Shelving which was designed specifically to maximise storage capacity and incorporate a flow through system facilitating maximum efficiency and productivity.
- The Workshop included Customised Heavy Duty Workbenches and Customised Heavy Duty Under Bench Cabinets. The Workshop was segregated into specific areas: Boiler Workshop, Mechanical Workshop & Electrical Workshop. Fitted out in these areas were customised heavy duty workbenches and heavy duty under bench cupboards, creating a corporate uniform image.
- The Facility also included an Electrical Store which was fitted out with Rolled Edge Shelving and a Dust Free Environment, ideally built for small parts & storage.
- Wash Down Facility was also fitted out with an Emergency Shower, Stainless Steel Drainage Bench & Quench Tank as a wash down zone, ready for emergency requirements.